IEEE: wind-farms unprofitable
Mike O'Dell
mo at ccr.org
Wed May 26 21:47:06 CDT 2010
It's common knowledge in the wind biz that gearboxes are the Achilles Heel of turbines. That is why there's a huge push for direct-drive turbines. GE Wind's new 4 megawatt turbine designed specifically for offshore use is direct drive. Generators are rare earth permanent magnet units with rectifier inverters to make grid sync 60 Hz.
-mo
Sent from my iPad
On May 26, 2010, at 5:24 PM, andre kesteloot <andre.kesteloot at verizon.net> wrote:
> http://spectrum.ieee.org/energywise/green-tech/wind/trouble-brewing-for-wind
> _______________________________________________
> Tacos mailing list
> Tacos at amrad.org
> http://www.amrad.org/mailman/listinfo/tacos
More information about the Tacos
mailing list